Current Fee ScheduleWMMG Admin2025-10-27T13:25:25-04:00
Town of Mocksville Fee Schedule
2024-2025
CEMETERY
Columbarium Niche
Level I (Lowest Level)
$726.00
Level 2
$826.00
Level 3
$926.00
Level 4 (Highest Level)
$1026.00
Note: $26.00 Recording Fee
Grave Plots
Grave Marker Deposit
$350.00
Town Residents (One plot per resident may be purchased at this price)
$626.00
Non-residents and additional plots for residents
$1226.00
Note: $26.00 Recording Fee
Urn Garden
Town residents
$526.00
Non-residents
$826.00
Note: $26.00 Recording Fee
ANNEXATIONS FEES
Annexations Fees
$350.00
CODE ENFORCEMENT
Triaxle Dump Truck
$105.00 per Hour
Semi & Dump Trailer
$150.00 per Hour
Excavator
$225.00 per Hour
Mowing – Zero Turn & Weedeater
$500.00 Flat Rate
Tractor w/ Bushhog & Weedeater
$1,000.00 Flat Rate
Skid Steer
$110.00 per Hour
Trash Removal
$850.00 Flat Rate + Disposal
Solid Water Violations
$100.00 per Day
FIRE
Opening Hydrant
$100.00
MISCELLANEOUS
Returned Check Fee
$25.00
Returned Payment via Online
$15.00
Code Ordinance Book
$50.00
PUBLIC RECORD REQUESTS
Special Service Charge (after 4 hours)
$25.00/hour
Paper Reproduction Costs
$0.25 per copy
MOCKSVILLE EDUCATION BUILDING
Not for Profit Entity
$75 per hour
PARKS AND GROUNDS
All shelter rentals by Town Residents are reimbursable following inspection when finding the area left clean. All shelter rentals by Town Residents (Inside Town Limits Only) are discounted at a rate of 50%.
48hr notice is required to rent shelters. Shelters are only available for rent:
Morning: 10 a.m. to 2 p.m.
OR Afternoon 3 p.m. to 7 p.m.
*Additional $10 for shelter rentals before 10 a.m. & after 7 p.m. The full day fee will be charged for all rentals that include Morning and Afternoon times.
All shelter rentals by Town Residents (Inside Town Limits Only) are discounted at a rate of 50%.
Shelter rental 4 hours or less
$60.00
Town Residents rental 4 hours or less
$30.00
Shelter #4 – no restrooms
$35.00
Town Residents Shelter #4 – no restrooms
$17.50
Shelter rental more than 4 hours
$120.00
Town Residents Shelter rental more than 4 hours
$60.00
Rich Park Rental (Entirely)
$1,000.00
Softball Field Tournament Rate (Monday-Thursday)
$150.00 per day
Softball Field Tournament Rate per weekend (Friday – Sunday)
$150.00 on day one & each consecutive day there after is $100.00 per day with utility fee $30.00 per hr. 6-10 p.m. Monday-Sunday
Softball Field Daily Non-Tournament Rate
$15.00 per hour with 3 hr. minimum, 8 a.m. – 5 p.m.
Softball Field Nightly Rental Rate
$30.00 per hour with 3 hr. minimum, 6 p.m. – 10 p.m.
After Hours Field Prep Fee
$25.00 per hour with 2 hr. minimum (daily tournament rentals only)
Baseball Field Rental Tournament Rate
$250.00 on day one & each consecutive day thereafter is $200.00 per day with a utility fee $30.00 per hr. 6 p.m. -10 p.m.- plus $100.00 deposit
Baseball Field Nightly Rental Rate – 6 p.m. to 10 p.m.
$30.00 per hour with 3 hr. minimum
Baseball Field Daily Non-Tournament Rate – 8 a.m. to 5 p.m.
$20.00 per hour with a 3 hr. minimum
After Hours Prep Fee
$25.00 per hr. with a 2 hr. minimum (daily tournament rentals only)
Tennis Courts – Rental /Reservation – Two Hour Session
$4.00 per court
Tennis Courts – Rental /Reservation – League Fee (up to eight weeks)
$5.00 per scoop + $25.00 Delivery fee (if needed) $10.00 Pick Up $20.00 trailer load up to 16’ $30.00 truck and trailer together **No commercial tandem dump trucks allowed for drop off except Town of Mocksville** (Town residents may drop off one load per month- free of charge)
Solid Waste Collection – Landfill and Recycle Fees
$17.80 per month
STREET SIGNS
Intersecting Public Roads
$Cost
Stop Signs for Private Streets
$Cost
Street Name Changes
$Cost
Street Name Sign at Intersection of Public And Private Street
$Cost
Handicap Signs/ Purchased from Public Works – Reserved Parking w/ Handicapped symbol
$Cost
Handicap Signs/ Purchased from Public Works – Maximum Penalty $250.00
$Cost
Post
$20.00
SEWER CONNECTION
Sewer Connection
Town Price
Contractor Price
4″ Sewer Connection Fee
$1,650.00
$975.00
6″ Sewer Connection Fee
$3,500.00
$1,100.00
8″ Sewer Connection Fee
N/A
$1,225.00
FIRE CONNECTION
Fire Connection
Town Price
Contractor Price
4″ Fire Connection Fee
$3,950.00
$1,000.00
6″ Fire Connection Fee
$4,700.00
$1,050.00
WATER CONNECTION
Water Connection
Town Price
Contractor Price
¾” Water Connection Fee
$1,650.00
$975.00
1″ Water Connection Fee
$2,300.00
$1,000.00
1 ½” Water Connection Fee
$3,150.00
$1,025.00
2″ Water Connection Fee
$4,700.00
$1,050.00
3″ Water Connection Fee
N/A
$1,100.00
4″ Water Connection Fee
N/A
$1,150.00
6″ Water Connection Fee
N/A
$1,200.00
8 “Water Connection Fee
N/A
$1,250.00
10″ Water Connection Fee
N/A
$1,300.00
12″ Water Connection Fee
N/A
$1,350.00
Production Rate (Catastrophic Leak)
$2.97
Deposit
$200.00
Meter Calibration
$75.00
Meter Lock or remove
$60.00
Reconnect Fee
$35.00
Second Trip Cut on Fee – (If water is left on in house and 2nd trip is required)
$35.00
Late Penalty
$25.00
Replace Damaged Meters
$125.00 plus market cost
WATER & SEWER RATES
Inside 0 – 3,000 Water
$43.32
Inside 0 – 3,000 Sewer
$52.43
Per 1000 Gallons after minimum: Water
$6.15
Per 1000 Gallons after minimum: Sewer
$8.04
Outside 0 – 3,000 Water
$75.24
Outside 0 – 3,000 Sewer
$103.93
Outside – Per 1000 Gallons after minimum: Water
$10.47
Outside – Per 1000 Gallons after minimum: Sewer
$12.45
SYSTEM DEVELOPMENT FEES
Meter Size
Water Fee
Sewer Fee
¾”
$602.75
$752.31
1”
$1,004.58
$1,253.86
1.5”
$2,009.16
$2,507.72
2”
$3,214.65
$4,012.34
3”
$6,429.30
$8,024.69
4”
$10,045.78
$12,538.58
6”
$20,091.56
$25,077.16
8”
$32,146.49
$40,123.45
10”
$84,384.53
$105,324.05
12”
$106,485.24
$132,908.92
PRETREATMENT FEES – PRETREATMENT SURCHARGE FEES FOR SIU
TOTAL SUSPENDED SOLIDS (TSS) (PER POUND) (OVER 200 MG/L)
$0.15
OIL AND GREASE (PER POUND) (THRESHOLD TBD)
$0.29
PRETREATMENT PROGRAM ADMINISTRATION CHARGES
SAMPLING EVENT FEE (PER OCCURANCE)
$225.00
RENEWAL PERMIT FEE
$975.00
PRETREATMENT INSPECTION FEE (PER OCCURANCE)
$260.00
PRETREATMENT RE-INSPECTION FEE (PER OCCURANCE)
$135.00
SLUG CONTROL PLAN REVIEW FEE (PER OCCURRENCE)
$150.00
NONCOMPLIANCE INVESTIGATION FEE (PER HOUR)
$150.00
SYSTEM DEVELOPMENT FEES
NEW PERMIT FEE
$2,500.00
PERMIT REVISION FEE
$1,045.00
PRETREATMENT DESIGN REVIEW FEE (PER OCCURRENCE)
$350.00
PT CONSTRUCTION SITE INSPECTION FEE (PER OCCURRENCE)
$240.00
IMPACT FEES – PENALTY FOR SIUs – PERMIT LIMIT VIOLATIONS
BIOCHEMICAL OXYGEN DEMAND (BOD) (PER DAILY MAX VIOLATION)
$250.00
BIOCHEMICAL OXYGEN DEMAND (BOD) (PER MONTHLY AVERAGE VIOLATION)
$200.00
TOTAL SUSPENDED SOLIDS (TSS) (PER DAILY MAX VIOLATION)
$250.00
TOTAL SUSPENDED SOLIDS (TSS) (PER MONTHLY AVERAGE VIOLATION)
$200.00
OIL AND GREASE (PER DAILY MAX VIOLATION)
$350.00
OIL AND GREASE (PER MONTHLY AVERAGE VIOLATION)
$300.00
OTHER VIOLATIONS
Failure to monitor discharge (per parameter, per event)
$50.00
Significant noncompliance due to technical review criteria violations (per parameter, per 6-month period)
$2,500.00
Significant noncompliance due to chronic violations (per parameter, per 6-month period)
$5,000.00
Unintentional prohibited discharges
$500.00
Unintentional prohibited discharges which cause damage to the collections system, wastewater treatment plant, or endangerment to health or the environment
$12,250.00
Intentional prohibited discharges
$12,250.00
Intentional prohibited discharges which cause damage to the collections system, wastewater treatment plant, or endangerment to health or the environment
$24,000.00
Failure to report spill or change in discharge
$500.00
Negligently operated pretreatment facility causing damage to the collections system, wastewater treatment plant, or endangerment to health or the environment (per 6 month period)
$20,000.00
Failure to comply with a requirement issued in a directive letter or statement of assurance of voluntary compliance (per 6-2.8(A)(1))
$1,250.00
Failure to comply with a requirement issued in a consent order (per 6-2.8(A)(1))
$12,250.00
Failure to comply with an Administrative Order (per 6-2.8(A)(4))
$12,250.00
Failure to pay a fine imposed in response to a previous violation within 60 days
$1,250.00
Failure to submit explanation letter and corrective action plan within 30 days of notification of violation
$1,250.00
Falsification of data or failure to report or accurately report noncompliance